Key Projects
Ecological Restoration was hired to complete a river restoration on campus at the University of Toledo Main Campus. This project involved restoring the Ottawa River by adding rock features, fish habitat lunkers, locked logs, construction of a walking path, boulder habitat, Longitudinal Peaked Stone Toe Protection, bank regrading, tree and shrub planting, living dikes and rock keyways. Completed in the summer during low flow, mostly using long reach excavators.
another UT article to attach:
Link 1
University of Toledo River Restoration Report 2013
Link news article
Ottawa River Timelapse
Ottawa River All Videos
Click on the images below to view a larger display.
|